Instantiating Section 3–4 replacement designs at the concrete Lemma 4.8 parameter schedule #
Section 4.7 of [OpenAI2026ETH] (Lemma 4.8, equations (4.17)–(4.18), pp. 34–35) chooses the
concrete polylogarithmic parameter schedule (numGroups n, numNodes n, rowBound β n, auxDim n, tau n, intervalStart β n) so that all numerical hypotheses of Lemma 4.7 hold for sufficiently
large n and the three-term counting-cost rate
$$ \frac{R}{Q} \log \frac{2Q}{R} + \tau \log(2D + 1) + \frac{1}{r} $$
is bounded by $O_\beta(\nu^2 / \sqrt{\lambda}) = o(1)$.
This module connects Cslib.Complexity.SubexponentialSAT.ReplacementParams with the concrete
algebraic replacement design construction Cslib.LinearAlgebra.ReplacementDesign (Lemma 4.7) and
the shared-summary counting design interface Cslib.ReplacementCounting.Design (Definition 3.1 and
Proposition 3.4):
Exact rational-to-real alignment of the schedule parameters:
tauRat n : ℚ := 1 / ((numGroups n : ℚ) * Nat.clog 2 n)casts totau n : ℝ.- When
1 ≤ numGroups nand1 ≤ rowBound β n, the rational binomial tail probabilitybinomTailProb (numNodes n) (numGroups n) (intervalStart β n) (rowBound β n)casts tobinomTail β n : ℝ(cast_binomTailProb_eq_binomTail). Cslib.ReplacementCounting.threeTermExponent (numGroups n) (numNodes n) (rowBound β n) (auxDim n) (tau n)is definitionally equal torowCost β n(threeTermExponent_eq_rowCost).
From
Feasibleto concrete and counting replacement designs:Feasible.exists_replacementDesign: anyFeasible β n b w (∑ f, #(scope f))instance on a factor scope familyscope : F → Finset (Fin n)with1 ≤ b, w, per-variable degree≤ b, per-factor width≤ w, and total incidence∑ f, #(scope f) ≤ b * nyields a concreteCslib.LinearAlgebra.ReplacementDesignat the Lemma 4.8 schedule.Feasible.toCountingDesignandFeasible.domainExaminationBound_le_mul_exp_rowCost: converts any concrete schedule design into aCslib.ReplacementCounting.Designwhose Proposition 3.4 domain-examination count is bounded by2 * numNodes n * numGroups n * exp ((c + 4) * n * rowCost β n)and hence by the explicitO_β(n * ν² / √λ)subexponential bound of Lemma 4.8.exists_schedule_replacementDesign: combinesexists_feasible(Lemma 4.8) withFeasible.exists_replacementDesign(Lemma 4.7) to give the uniformn₀ ≥ 20threshold for the polylogarithmic regime1 ≤ b, w ≤ (Nat.clog 2 n) ^ βandn ≤ M ≤ b * n.
Main definitions #
Cslib.Complexity.SubexponentialSAT.ReplacementParams.tauRat: rational step scale1 / (numGroups n * Nat.clog 2 n) : ℚ.Cslib.Complexity.SubexponentialSAT.ReplacementParams.Feasible.toCountingDesign: canonicalCslib.ReplacementCounting.Designattached to a concrete scheduleReplacementDesign.
Main results #
Cslib.Complexity.SubexponentialSAT.ReplacementParams.cast_binomTailProb_eq_binomTail:((binomTailProb (numNodes n) (numGroups n) (intervalStart β n) (rowBound β n) : ℚ) : ℝ) = binomTail β n.Cslib.Complexity.SubexponentialSAT.ReplacementParams.threeTermExponent_eq_rowCost:threeTermExponentat the Lemma 4.8 schedule equalsrowCost β n.Cslib.Complexity.SubexponentialSAT.ReplacementParams.Feasible.exists_replacementDesign,Cslib.Complexity.SubexponentialSAT.ReplacementParams. exists_schedule_replacementDesign: end-to-end Lemma 4.7 + Lemma 4.8 + Proposition 3.4 mathematical assembly.
References #
- OpenAI, The Exponential Time Hypothesis is False, Section 3.5, Proposition 3.4, pp. 25–26; Section 4.6, Lemma 4.7, pp. 33–34; Section 4.7, Lemma 4.8, pp. 34–35.
1. Rational parameter alignment with Lemma 4.7 #
Rational measurement step scale τ = 1 / (r λ) ∈ ℚ of equation (4.17)
([OAI26c], p. 34).
Instances For
When 1 ≤ rowBound β n, membership in interval β n is equivalent to lying in
[intervalStart β n, intervalStart β n + rowBound β n).
When 1 ≤ numGroups n and 1 ≤ rowBound β n, casting the rational binomial tail probability
binomTailProb (numNodes n) (numGroups n) (intervalStart β n) (rowBound β n) to ℝ gives
binomTail β n.
The three-term counting-cost rate threeTermExponent instantiated at the Lemma 4.8 schedule
is definitionally equal to rowCost β n.
2. Extracting Lemma 4.7 hypotheses and designs from Feasible #
1 ≤ n holds under Feasible β n b w M.
Under Feasible β n b w M, the rational binomial tail probability satisfies Lemma 4.7's
strict threshold binomTailProb < tauRat n / (numGroups n * b).
Lemma 4.7 + Lemma 4.8 concrete replacement design existence:
Given hF : Feasible β n b w (∑ f, #(scope f)) on a factor scope family
scope : F → Finset (Fin n) with 1 ≤ b, 1 ≤ w, per-variable occurrence ≤ b, per-factor
scope size ≤ w, and total incidence ∑ f, #(scope f) ≤ b * n, there exists a concrete
Section 4
ReplacementDesign scope (numNodes n) (numGroups n) (intervalStart β n) (rowBound β n) (tauRat n).
Converts any concrete ReplacementDesign at the Lemma 4.8 schedule into a Section 3
Cslib.ReplacementCounting.Design for an active factor subset s : Finset F.
Instances For
Proposition 3.4 + Lemma 4.8 domain-examination bound in terms of rowCost β n:
For any Feasible β n b w M and concrete schedule design D, the induced counting design
hF.toCountingDesign D s examines at most
2 * numNodes n * numGroups n * exp ((c + 4) * n * rowCost β n) local Boolean assignments across
all numNodes n nodes and all subset pairs (E, U) with #E ≤ q ((q : ℝ) ≤ c * n * (R / Q)),
which in turn is bounded by
2 * numNodes n * numGroups n * exp ((c + 4) * n * (1028 * (β + 3) * ν² / √λ)).
Uniform Lemma 4.7 + Lemma 4.8 schedule design existence:
For every integer 1 ≤ β, there exists n₀ ≥ 20 such that for all n ≥ n₀,
1 ≤ b, w ≤ (Nat.clog 2 n) ^ β, and any factor scope family scope : F → Finset (Fin n) with
n ≤ ∑ f, #(scope f) ≤ b * n, per-variable occurrence ≤ b, and per-factor width ≤ w, the
schedule (4.17) is Feasible and admits both a concrete ReplacementDesign and an induced
Cslib.ReplacementCounting.Design.